Screen Solutions

Commercial Motorized Screens

On a commercial patio the screens are infrastructure rather than comfort. The specification question is not whether the space feels nice — it is how many days a year it can be sold, and what stops that happening.

The problem

Empty terrace seating is capacity sitting idle

A residential patio that goes unused is a disappointment. A commercial terrace that goes unused is unsold capacity, and the arithmetic is different enough that the whole specification changes.

In our markets the conditions that empty a terrace are specific and repeatable: low afternoon sun straight into west-facing seating, blowing dust ahead of a front across the Permian Basin and South Plains, and wind-driven rain that clears an outdoor section in minutes. Each is addressable. None is addressed by the same material.

We will not tell you how many extra covers a screen buys you. We do not have that data for your site, nobody credible does, and a number invented for a proposal is worse than no number.

The specification

How a commercial specification differs

Five things a commercial project asks about that a residential one never does.

01 — Duty cycle

Duty cycle is the first question

A homeowner might operate a screen a few times a week. A terrace may cycle every service, twice a day, every day. That changes the conversation about motors, controls and how the system is specified — and it is the question we ask first on a commercial enquiry.

  • How many times a day will the screens actually move?
  • Who operates them, and from where?
  • What happens if one is left down overnight?

02 — Operation

Staff have to be able to use it without thinking

A control scheme that a homeowner learns once does not survive staff turnover. Grouping openings so a whole side closes with one action, and putting the control where the person closing up actually walks past, matters more commercially than any feature on a spec sheet. This is planned during specification, not handed over at the end.

  • Group openings so one action closes a whole side.
  • Put controls on the closing-up route, not in an office.
  • The simplest scheme that works beats the most capable one.

03 — Approval

Approval usually involves more than a city

A commercial exterior change can involve a landlord, a property manager, a body corporate and a municipality — sometimes all four, on different timelines. In an appearance-sensitive district there may be design review on top. Establishing who has to say yes, before anything is ordered, is part of the job.

  • Landlord or property manager consent is often required.
  • Municipal requirements differ by city across our footprint.
  • Design review may apply in historic or appearance-sensitive districts.

04 — Installation

Installation has to fit around trading

Whether the terrace has to close, for how long, and at which hours, is part of the specification rather than a scheduling detail worked out afterwards. On a working site that is often the constraint that shapes everything else.

  • Which hours can work happen without losing service?
  • Can the job be phased by section?
  • What access does the site actually allow?

05 — Material

The material still follows the problem

Commercial does not mean one specification. A west-facing terrace wants solar control; a terrace that keeps trading through a front wants clear vinyl on the exposed side; a terrace beside a car park may want a privacy weave for the outward view. Frequently one terrace needs two of the three on different sides.

  • Sun, weather, dust and outlook are separate problems.
  • One terrace commonly needs more than one material.
  • The decision is still made opening by opening.

Being straight with you

We do not publish a client list

A commercial buyer reasonably wants to know who else we have worked with. We are not going to answer that with names, logos or photographs, because we do not publish customer details or project locations anywhere on this site.

That is a deliberate position rather than an evasion. A photograph of a named venue under a hospitality heading reads as a client reference whether or not the caption says so, and we would rather be a company that does not do that than one which quietly does. What we will do is talk through your terrace specifically, in detail, at the consultation.

You should apply the same scepticism to anyone who does show you a logo wall — ask what the relationship actually was.

Questions

Questions from operators

How many more covers will this give us?

We will not invent a figure. We do not have data for your site and any number we produced would be a guess dressed up as a projection. What we can do is walk the terrace with you and identify which conditions are emptying which sections, which is the part that actually informs the decision.

Do we need a permit or landlord approval?

Frequently both, and they run on separate timelines. Municipal requirements differ across our markets and a lease usually has its own consent process for exterior alterations. The approval guide explains how to establish what applies. We are not the approving authority and cannot promise an outcome.

Will we have to close the terrace to install?

That depends on the size of the job, the layout and the access. It is something we work out before scheduling rather than after, and on many sites the work can be phased by section so trading continues.

Can staff operate it without training?

That is a design goal rather than an accident. Grouping openings so one action closes a whole side, and siting controls on the route staff already walk at closing, is planned during specification.

Can the screens stay down overnight?

Physically yes, but we would advise against it in this region during spring, when severe weather is most likely. A screen left deployed through a hail event risks damage without protecting anything. The weather exposure page covers why that matters here.

What does a commercial project cost?

There are no prices on this site. Number of openings, widest span, structure, material, control scheme, approval requirements and installation access all move it. The cost guide sets out what a quote should itemise so you can compare two of them properly.

Start a project

Tell us about the terrace

Number of openings, widest span, how the space trades, and who has to approve it. That is enough to start.